|
4443 CR 207 Liberty Hill, TX 78642 512-778-6011 SUMMARY
EXPERIENCE AXCELIS TECHNOLOGIES (formerly Eaton Corporation), Beverly, MA Facilities Engineering Manager June, 2000 - November, 2002 Responsibilities: Overall responsibility for maintaining "World Class" facilities, buildings and grounds for 470,000 sq.ft. Beverly site. Responsible and accountable for operating maintenance budget of $8-10MM, capital budget, project management for site improvements, construction projects, long range facilities planning, security, and housekeeping. Provide oversight and direction to maintain a Preventative Maintenance program for existing and future plant equipment. Supervise a 14 person staff with 4 direct reports. Accomplishments: · Project Manager for 6,000 sq. ft. Central Utility building construction
addition - $3.4MM. This includes General Contractor oversight for construction
quality, cost, drawing modifications and start-up. Owner July,1999 - May, 2000 Responsibilities: Contracted with Eaton Corporation to provide maintenance of buildings and grounds until property was sold. Signed additional contract with Eaton to manage TPS Transition Project for
another business unit from Peabody, MA. to Beverly, Ma. In addition, managing
two other projects at Beverly facility to accommodate business volume increases.
This project includes construction of Cleanroom space, Machine Shop space, and
re-arrangement of various departments within the facility. The scope includes
overseeing Architect and General Contractor with budget responsibilities for
total project. EATON SEMI-CONDUCTOR, Austin, TX Facilities Manager October,1997 - June,1999 Responsibilities: Maintain "World Class" building and grounds, HVAC, Cleanroom, mechanical, and electrical equipment in an efficient and productive manner so as to provide a work environment conducive to the manufacture of semi-conductor equipment. Monitor utility costs, repair costs, and other costs in order to minimize overall maintenance expense. Accomplishments: * Negotiated Industrial Gas Rate for facility that resulted in a $75,000/yr
savings EATON ENGINE COMPONENTS, Kearney, NE Sr. Manufacturing Engineer 1994-1997 Responsibilities: Responsible for productivity increase, cost reduction, and capital equipment justification/installation for Engine Valve product line. Supervise Forge/Heat Treat Maintenance on three-shift operation with responsibility for budgets. Accomplishments: * Increased daily production average from 240,000 to 350,000 units per day EATON ENGINE COMPONENTS, Kearney, NE Gear Product Manager 1988-1994 Responsibilities: Overall profit responsibility for Precision Forged Gear product line. Total sales volume of $15 million. Accomplishments: * Profit improvement of 20% AC SPARK PLUG, Wichita Falls, TX Manufacturing Supervisor 1986-1988 Responsibilities: Daily production requirements, quality, safety, and efficiency for Exhaust Oxygen Sensor product Accomplishments: * Achieved required production levels within two weeks MAINTENANCE SUPERVISOR 1984-1986 Responsibilities: Maintenance of Facilities, Buildings and Grounds and supervise Tool Room Accomplishments: * Implemented PM program for plant equipment resulting in increased machine
up-time GH FOLEY DRILLING TOOLS, Jennings, LA & Wichita Falls, TX Plant Manager 1980-1984 Responsibilities; Profit responsibility for Oil field drilling tools company Accomplishments: * Implemented manufacturing systems and controls to improve productivity HYSTER COMPANY, Danville, IL 1970-1980 ELI LILLY AND COMPANY, Indianapolis, IN
1966-1970 EDUCATION BS, General Engineering, University of Illinois OTHER Board of Directors Kearney Area Chamber of Commerce 1990-1994 |